Our Certified Product Catalog
Filter 100+ models by category, thickness and certification.


From yarn to packaging, all under one roof
With 410 knitting machines and a 140-person team, a monthly capacity of 1.8 million pairs at our 5,000 m² vertically integrated facility in Mersin.
[ PRODUCTION PROCESS ]
98%
On-Time Delivery Rate
START
Our critical yarn stocks are always kept ready. The moment an order is confirmed in the system, the production line starts running without waiting for raw materials.
CONCURRENCY
While the production line runs, packaging and labeling approvals are completed in parallel. By preventing processes from waiting on one another, operational time loss is reduced to zero.
FACILITY FLOORPLAN






5,000 m² · 6 floors · Mersin
MACHINE PARK & EQUIPMENT INVENTORY
[ PROD / LONATI 615 GL — SINGLE CYLINDER ]
[ TOPLAM: 303 ]
L-615-GL | 156N / Single Cylinder
120 pcs
In Active Production
L-615-GL | 156N / Single Cylinder
85 pcs
In Active Production
L-615-GL | 156N / Single Cylinder
45 pcs
In Active Production
[ PROD / KOMET — DOUBLE CYLINDER ]
[ TOPLAM: 107 ]
KOMET | Double Cylinder
60 pcs
In Active Production
KOMET | Double Cylinder
40 pcs
In Active Production
[ PRODUCTION LINE ]
[ QUALITY CONTROL CRITERIA ]
Incoming yarn conformity certificate, color matching, tensile-tear resistance and certificate traceability.
At the knitting machine — pattern accuracy, stretch and length measurement, scanning for streaks/skips/runs/cuts.
Smoothness of the seam line, density of stitches, calibration along the toe line.
Form and size accuracy, label placement, packaging integrity.
Pre-logistics label, barcode and shipping waybill conformity approval.
Get in touch to connect your operation to our hardware infrastructure with a monthly capacity of 1.8M pairs, and to evaluate capacity availability and on-site audit options together.
Filter 100+ models by category, thickness and certification.

Minimum order quantity from 2,000 pairs · Lead time 3-8 weeks · Sampling time 48-72 hours.
